TBM

Harker Underground Construction’s resources include a range of tunnel boring plant and equipment for installing pipe from 450mm to 3000mm in diameter, in varying ground conditions.


Slurry Separation Plant

A multi-stage re-circulating separation plant consisting of inclined vibrating screens, de-sanding hydro-cyclones and centrifuges.

MTS1000A

The MTS1000A is a remote controlled auger MTBM with a full face cutting shield.

Akkerman WMCF 2000H

The Akkerman 2000H is an open-faced TBM with a full face cutting shield.